KoldPack  inc.             call 1-800-824-2661                    

Commercial refrigeration systems

walk-in coolers and freezers  

 Home ] Up ] Products ] Information ] Contact Us ]

 

INSTALLING ROOF CAP

1. Required for outdoor installation only. (Specify when placing order).

2. Position membrane over the exterior roof panels allowing 4" overhang on all sides. (Do not stretch).

3. Allow membrane to relax 1/2 hour prior to final positioning, splicing, cutting, or flashing.

4. Fold membrane at corners. (Do not cut).

5. Secure membrane to walls using screws and 3" X 3" flashing provided.

 

Back ] Home ] Up ]

 

 

KOLD PACK, INC.

5014 PAGE AVENUE

 JACKSON, MICHIGAN 49201

 

 

SUBJECT TO CHANGE WITHOUT NOTICE