WALK-INS - INSTALLING ROOF CAPS
 

1. Required for outdoor installation only. (Specify when placing order).

2. Position membrane over the exterior roof panels allowing 4" overhang on all sides. (Do not stretch).

3. Allow membrane to relax 1/2 hour prior to final positioning, splicing, cutting, or flashing.

4. Fold membrane at corners. (Do not cut).

5. Secure membrane to walls using screws and 3" X 3" flashing provided.

CONTACT//
KOLD PACK, INC.
5014 PAGE AVENUE
JACKSON, MICHIGAN 49201
1-800-824-2661

CUSTOM COOLERS , INC.
5609 AZLE AVE.
FORT WORTH, TEXAS 76114
1-800-627-0488