WALK-INS - INSTALLING ROOF CAPS
|
||||||
1. Required for outdoor installation only. (Specify when placing order). 2. Position membrane over the exterior roof panels allowing 4" overhang on all sides. (Do not stretch). 3. Allow membrane to relax 1/2 hour prior to final positioning, splicing, cutting, or flashing. 4. Fold membrane at corners. (Do not cut). 5. Secure membrane to walls using screws and 3" X 3" flashing provided. |
||||||
|